Table Of ContentAPPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
APPENDICES
APPEND ICES
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN 263
APPENDIX B CONCORD ROAD INTERCHANGE URBAN DESIGN AND LANDSCAPE SUB-PLAN 293
APPENDIX C WATTLE STREET INTERCHANGE URBAN DESIGN AND LANDSCAPE SUB-PLAN 321
APPENDIX D ARNOTTS RESERVE URBAN DESIGN AND LANDSCAPE SUB-PLAN 353
APPENDIX E CINTRA PARK PRECINCT URBAN DESIGN AND LANDSCAPE SUB-PLAN 377
APPENDIX F NOISE BARRIER LOCATION AND DESIGN SUB-PLAN 393
APPENDIX G CONSULTATION RECORD 433
263
PAGE INTENTIONALLY LEFT BLANK
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
x
e
n
n
o
C
t
s
e
W
265
PAGE INTENTIONALLY LEFT BLANK
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
TABLE OF A1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .269
A1.1 Ministers Condition of Approval
CONTENTS
A1.2 Revised Environmental Management Measures
A2 EXISTING ACCESS AND CONNECTIVITY ENVIRONMENT . . . . . .270
A2.1 Pedestrian network
A2.2 Cycleway network
A3 A4 ACCESS AND CONNECTIVITY PLANS . . . . . . . . . . . . . . . . . . .271
A3.1 Homebush Bay Drive Interchange
A3.1.1 Homebush Bay Drive Interchange - Existing conditions
A3.1.2 Homebush Bay Drive Interchange - Proposed conditions
A3.2 Concord Road Interchange
A3.2.1 Concord Road Interchange - Existing conditions
A3.2.2 Concord Road Interchange - Proposed conditions
A3.3 Wattle Street Interchange
A3.3.1 Wattle Street Interchange - Existing conditions
A3.3.2 Wattle Street Interchange - Proposed conditions
A3.4 Parramatta Road Interchange
A3.4.1 Parramatta Road Interchange - Existing conditions
A3.4.2 Parramatta Road Interchange - Proposed conditions
267
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
List of figures
Figure 1-1 - Existing cycling network within the project area. Source: NSW Government, bicycle information for NSW Cycleway Finder v3 (2016) 270
Figure 1-2 - Homebush Bay Drive Interchange - Existing access and connectivity - Sheet 01 of 04 - 1:2000 272
Figure 1-3 - Homebush Bay Drive Interchange - Existing access and connectivity - Sheet 02 of 04 - 1:2000 273
Figure 1-4 - Homebush Bay Drive Interchange - Existing access and connectivity - Sheet 03 of 04 - 1:2000 274
Figure 1-5 - Homebush Bay Drive Interchange - Existing access and connectivity - Sheet 04 of 04 - 1:2000 275
Figure 1-6 - Homebush Bay Drive Interchange - Proposed access and connectivity - Sheet 01 of 04 - 1:2000 276
Figure 1-7 - Homebush Bay Drive Interchange - Proposed access and connectivity - Sheet 02 of 04 - 1:2000 277
Figure 1-8 - Homebush Bay Drive Interchange - Proposed access and connectivity - Sheet 03 of 04 - 1:2000 278
Figure 1-9 - Homebush Bay Drive Interchange - Proposed access and connectivity - Sheet 04 of 04 - 1:2000 279
Figure 1-10 - Concord Road Interchange - Existing access and connectivity - Sheet 01 of 02 - 1:2000 281
Figure 1-11 - Concord Road Interchange - Existing access and connectivity - Sheet 02 of 02 - 1:2000 282
Figure 1-12 - Concord Road Interchange - Proposed access and connectivity - Sheet 01 of 02 - 1:2000 283
Figure 1-13 - Concord Road Interchange - Proposed access and connectivity - Sheet 02 of 02 - 1:2000 284
Figure 1-14 - Wattle Street Interchange - Existing access and connectivity - Sheet 01 of 02 - 1:2000 286
Figure 1-15 - Wattle Street Interchange - Existing access and connectivity - Sheet 02 of 02 - 1:2000 287
Figure 1-16 - Wattle Street Interchange - Proposed access and connectivity - Sheet 01 of 02 - 1:2000 288
Figure 1-17 - Wattle Street Interchange - Proposed access and connectivity - Sheet 02 of 02 - 1:2000 289
Figure 1-18 - Parramatta Road Interchange - Existing access and connectivity plan - 1:2000 291
Figure 1-19 - Parramatta Road Interchange - Proposed access and connectivity plan - 1:2000 292
List of tables
Table 01 - Revised Environmental Management Measures 269
268 • WESTCONNEX M4 EAST • Urban Design and Landscape Plan •
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
A1 Introduction A1.2 Revised Environmental
Management Measures
This Urban Design and Landscape Plan Sub-Plan has been
(REMMs)
prepared to satisfy the Ministers Condition of Approval B46(a)
(SSI6307).
This section of the sub-plan addresses issues raised during
Access and connectivity the consultation process and the Revised Environmental
Management Measures (REMM) raised in the Preferred
For the purposes of this sub-plan, access and connectivity is
Infrastructure Report (PIR) listed in the table following.
limited to pedestrian and cycleway enhancements within the
Table 01 Revised Environmental Management Measures
Project boundary.
Ref # REMM Response
The Access and Connectivity Sub-plan will include an
assessment of each accessibility and connectivity opportunity
Urban design and visual amenity
within each of the following Project areas:
• Homebush Bay Drive Interchange V4 Explore ways to integrate the project into existing The project has been integrated into existing streetscapes.
streetscapes, to improve connectivity, amenity and Pedestrian and cycle connectivity across the project has
• Concord Road Interchange
community value. been maintained, new street tree planting and landscape
• Wattle Street Interchange
rehabilitation has been provided, particularly in the Concord
• Parramatta Road Interchange Road Interchange, Wattle Street Interchange and Parramatta
Road Interchange precincts. This is all illustrated in the Urban
The sub-plan will note any additional impacts they may
Design Concept Plans in Section 2.5 and also in greater
generate, and a time commitment for the delivery of each
detail in the Landscape Design Plans in Section 9 and
opportunity identified.
Section A3 of this sub-plan.
A1.1 Ministers condition of Parramatta Road Transformation Program
approval
V45 Maintain and enhance pedestrian and cycle Refer Section A3 of this sub-plan.
connectivity across the Parramatta Road corridor.
The sub-plan provides details for the provision of connectivity
and accessibility enhancements within the Project boundary and V48 Consider opportunities to improve pedestrian and Refer Section A3 of this sub-plan.
connections to surrounding areas. The Access and Connectivity shared path amenity, for example by:
Sub-plan includes an assessment of each accessibility and • Introducing shade trees of appropriate scale
connectivity opportunity taking into account their effectiveness
• Separating users from busy traffic lanes behind a
and any additional impacts they may generate, and a time
landscape amenity strip
commitment for the delivery of each opportunity identified.
• Providing appropriate lighting for pedestrian
functions.
269
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
A2 Context
Throughout the Project boundary and surrounding areas, the There are also significant gaps in north-south connections,
existing access and connectivity opportunities are diverse due to the lack of permeability of Parramatta Road and the M4
and range from the M4 Motorway corridor to residential and Motorway.
parkland connections throughout Haberfield.
The Project scope includes connections to the proposed M4
Widening cycleway and on-road cycleway within the Homebush
A2.1 Pedestrian network
Bay Drive Interchange, with a new westbound connection from
The pedestrian network throughout the Project boundary is Parramatta Road.
fragmented due to the lack of permeability of Parramatta Road
and the M4 Motorway.
Outside the Project boundary, residential areas generally
provide good connections with footpaths on both sides of
streets.
Currently, the function of the M4 Motorway and Parramatta
Road generally favours the high volume of though traffic
movements, which consequently impacts the accessibility and
travel time for pedestrians crossing the road corridor.
A2.2 Cycleway network
Within the existing Project area, cyclist opportunities are quite
poor. Within the Homebush Bay Drive Interchange and Concord
Road Interchange areas, cyclists currently use the outside Figure 1-1 - Existing cycling network within the project area . Source: NSW Government, bicycle
shoulders of the M4 Motorway to travel both eastbound and information for NSW Cycleway Finder v3 (2016)
westbound. In the eastbound direction, cyclists are required
to leave the motorway at Sydney Street due to the inadequate
shoulder east of Sydney Street. In the westbound direction,
cyclists access the motorway from the westbound on-ramp at
Concord Road, due to inadequate shoulder east of this location.
Figure 12-1 shows the existing cycling network that surrounds
or intersects through the study area. There is currently a lack of
segregated cycling facilities along the Parramatta Road corridor.
Dedicated cycleways or cycle lanes that are provided are
separately geared towards leisure trips rather than commuter
trips with off road cycle paths predominantly restricted to
recreational foreshore or park areas.
270 • WESTCONNEX M4 EAST • Urban Design and Landscape Plan •
APPENDIX A ACCESS AND CONNECTIVITY MANAGEMENT SUB-PLAN
A3 Access and
connectivity plans
The following section of this sub-plan details the existing and
proposed pedestrian and cyclist access and connections within
the Project Boundary, as well as noting the existing surrounding
area connections. The plans also highlight existing and
relocated Bus Stops.
The plans are divided with existing and proposed plans within
the following areas of the Project:
• Homebush Bay Drive Interchange
• Concord Road Interchange
• Wattle Street Interchange
02
• Parramatta Road Interchange
A3.1 Homebush Bay Drive
01
Interchange
Existing conditions 01 Underwood Road pedestrian path
02 Existing M4 Motorway with poor provisions for
Currently, the M4 Motorway limits the permeability of pedestrian
cyclists
and cyclist connections across the Project area, and into
03 Existing Pomeroy Street Pedestrian Bridge to be
surrounding precincts.
retained
Within the Homebush Bay Drive Interchange, there is no
pedestrian access along the Motorway corridor, with crossing
only available at Pomeroy Street Pedestrian Bridge and
Underwood Road.
Proposed conditions
03
The proposed works will retain all current pedestrian
connections throughout the Project boundary and maintain
current connections within surrounding areas.
The project will improve cyclist connections, with proposed
cycleway connections to the M4 Widening project, and on-road
cycleway provisions in both directions of the Motorway with a
proposed cycleway as part of the M4 West westbound entry
ramp from Parramatta Road which will allow cyclists to connect
with the M4 Motorway.
Refer following Figures 12-2 to 12-5 for existing conditions,
and Figures Figures 12-6 to 12-9 for proposed access and
connectivity points.
271
A3 Access and connectivity plans
A3.1.1 Homebush Bay Drive Interchange - Existing conditions
LEGEND
BOUNDARIES
LEGEND CADASTRAL BOUNDARY
CADASTRAL BOUNDARY
BOUNDARIES
PME4REM PAENREMNATN WEONRT KWSO SRITKES BSOITUEN BDOAURNYDARY
CADASTRAL BOUNDARY
TME4MEPC TOAERDMAAPRSOTYRR WAAORL YRB KOWSUO NSRIDTKAESR BSYOITUEN BDOAURNYDARY
PME4REM PAENREMNATN WEONRT KWSO SRITKES BSOITUEN BDOAURNYDARY
CCOONNNNEECCTTIOIONN R ROOUUTTEESS
TME4MEP TOERMAPROYR WAORYR KWSO SRITKES BSOITUEN BDOAURNYDARY
EXIESXTIISNTGIN PGE DPEESDTERSITARNI APNA TPHATH
CCOONNNNEECCTTIOIONN R ROEOUXUTIPTSERETSOSINPGO CSYECDL PEEWDAEYSTRIAN PATH
EXIESXTIISNTGIN PGE DPEESDTERSITARNI APNA TPHATH
PROPRPOOPSOEDS EMD4 CWYICDLEENWINAGY CYCLEWAY
EXIPSRTOINPGO CSYECDL PEEWDAEYSTRIAN PATH
EXIPSRTOINPGO OSEPDEN S HSPAARCEED CPOATNHNECTIONS
PROPRPOOPSOEDS EMD4 CWYICDLEENWINAGY CYCLEWAY
B EXISTING BUS STOP
EEXXISIPSTRTINOINGPGO I NOSFEPODERN SM HSAPALAR CEED CPOATNHNECTIONS
OPEN SPACE CONNECTIONS
BB EEXXISIESTXTINIISNGTG IB NBUGUS SI NS SFTTOOORPPMAL
OPEN SPACE CONNECTIONS
B PROPOSED/RELOCATED BUS STOP
B EXISTING BUS STOP
B PROPOSED/RELOCATED BUS STOP
A
D
J
O A
IN A D
S PROPOSED DJOINS PROP JOINS PROPO ADJOINS P
CO OSE SED ROP
NNEC D CO CON OSED
TIVIT NNEC NECT CON
Y PLA TIVIT IVITY NECT
NS SHEET 02 Y PLANS SHEE PLANS SHEET IVITY PLANS S
T 0 2 HE
2 E
T
2
Figure 1-2 - Homebush Bay Drive Interchange - Existing access and connectivity - Sheet 01 of 04 - 1:2000
227722 • WESTCONNEX M4 EAST • Urban Design and Landscape Plan •
Description:WESTCONNEX M4 EAST • Urban Design and Landscape Plan • This Urban Design and Landscape Plan Sub-Plan has been ANSOR ROAD. S.